Up ]

15_March_Bookshelves.JPG (129207 bytes)

Our carpenter was hard at work at 9 at night.  He is doing a fantastic job on the shelving, we couldn't be happier with how he has taken our crude drawings and created something beautiful.

15_March_GuestBath.JPG (104099 bytes)

The half-bath with its little sink and toilet. 

15_March_HearthRoom.JPG (109446 bytes)

The tile is in place around the hearth room fireplace.  We picked it out at Su Casa, a great little store on Regency Road.

15_March_Tabitha_sink.jpg (129211 bytes)

Chris had to take a picture of me behind the sink because he knew he wouldn't see it very often!

15_March_Kitchen.JPG (134698 bytes)

The new counter tops.

15_March_Stove_Area.JPG (97088 bytes)

A closer view of the counters.  The empty space is for the stove top.

15_March_Master_closet.JPG (92100 bytes)

The shelving started in the master closet.

15_March_Pantry.JPG (101028 bytes)

Walk-in pantry shelving.

15_March_Shower_Grouted.JPG (103252 bytes)

The master shower, all grouted.

15_March_TubTile.JPG (135673 bytes)

The tub is almost ready to use!

15_March_Utility_Room.JPG (93237 bytes)

The utility room.

15_March_WetBar.JPG (129582 bytes)

The wet bar has its counter and little sink.